ICG 8 - 2006 Yokohama Japan E.03.05 Modern solutions based on geosyntetics applied for the execution of a retaining wall on the road section DN13 Bra?ov – Sighi?oara km 37+049 – km 37+129.pdf A., Barariu, E., Hanganu, L., M. & Gruianu C. Feodorov, R??dulescu, V. Fodor, V. Voicu Access
ICG 8 - 2006 Yokohama Japan E.02.06 The construction of an embankment in Iran designed to fail by rotation to lift 4 m of crystalline salt from the river bed out of the water.pdf A., P. Holgate, Rankilor Access
ICG 8 - 2006 Yokohama Japan E.01.02 Sisal fibre geotextiles for soil strengthening.pdf A., D. & Karri, Mwasha, R., R. S., Sarsby, Searle Access
ICG 8 - 2006 Yokohama Japan D.4.01 Reinforced earth structures on soft alluvial deposits improved with prefabricated vertical drains and stabilizing berms.pdf A., Biswas, S. Adhikari Access
ICG 8 - 2006 Yokohama Japan B.6.8 Thermoplastic lined tunnels for transport and storage of waste and potable water.pdf A., Lueghamer Access
ICG 8 - 2006 Yokohama Japan B.3.02 Experiment on geotextile tube dehydration method with nonwoven fabric tube for acceleration of dehydration work.pdf A., Azuma, H. Nishigata, K. & Kurata, M. Saeki, Okamura, T. Access
ICG 8 - 2006 Yokohama Japan A.2.10 Use of geosynthetics for lining and drainage systems in quarry landfills.pdf A., Cowland, J.W. Sadlier, M.A. Bouazza Access
EuroGeo 3 - 2004 Munich Germany B.4.5 Review and design approach of retaining structure built against and connected to a nailed embankment.pdf A., F., Paris, Ziai Access
EuroGeo 3 - 2004 Munich Germany B.4.2 Nordic guideline for reinforced soils and fills.pdf ?iseth, A., Al?n, C., E., Franz?n, G., K., Kjeld, Od?n, Rogbeck, Y. Access
EuroGeo 3 - 2004 Munich Germany B.5.5 Long-term durability of geogrids laid in reinforced soil wall.pdf A., Hazama, Hirai, Itagaki, Onodera, S., T. Access