Skip to content

A Geomembrane Liner Failure: Design, Installation, and-·communication Lessons Learned

The world’s largest single cell HOPE-lined pond, at the time of its installation in 1987, failed soon. after being placed in service due to a series of installation, construction quality assurance, and ·material related problems. The field and laboratory analyses that identified these problems are described, together with remedial actions taken to effect repairs.