Skip to content

The fabric reinforced Spillway Walls of the Mukakuning Dam have been in service since 1988. The backfill materials are residual soils. The maximum height of the walls was 10.8 m with nineteen layers of geofabrics with an ultimate tensile strength of 200 kN/m. The maximum settlement of the top of the walls was about 200 mm and the maximum total horizontal displacement of the walls was about 280 mm.