The design of a recent earth dam across the Nile was changed ·from hydraulic sandfill to ·a conventional sand-and-gravel emb ent. In the new design all filters were obtained with geotextiles of different grade. A large part of the geotextiles have been placed underwater. The papers provides the methodology followed during design and describes how construction was ca11ied out.